Attendees:
Notes:
- Big red
- Hour meter
- The hour meter started from 1.6 hours, at 20171210
- 11.5 hours, at 20171217
- 31.2 hours, at 20171230
- 72.05 hours, at 20180210
- 95.8 hours, 20180305
- 181.65 hours, 20180604
- 234.8 hours, 20180702
- 295.5 hrs, 20180827
- 326 hours, 20180924
- BlakeS relevel 20180916
- Chaff under honeycomb - nozzle to target 19mm centre, 22mm top-right. Clean and level.
- missing 1-2mm shim pieces?
- and the vacuum was full!
- Relevel and clean base section
- Need some extra M4 socket head cap bolts & nuts/wingnuts to hold tensioners
- ACTION: Fletcher: will pick some up
- Cleaned lens (pretty bad) and front mirror
- Little red
- Cutting 3mm MDF at 8mm/sec
- Still overcurrent at 25mA
- Still tube change being pursued
- Require end extension
- Require tube mounts
- Cleaned lens and mirrors
- Cut speed increased to 12mm/s