subcommittee:laser-minutes-20220713

Laser Subcommittee Meeting 2022-07-13

  • Attendees: BlakeS, NickB, BruceC, JohnP, …?
    • 6-weekly Wednesday evening Wine&Design?
DateHour countNotes
2013-11-04-2000? LC1290 commissioned with Reci 130W-155W W6 tube (manufactured 2013-08-22); (and LG500 with Chengdu Weegiant 60W tube)
2016-07-05-750? Original Reci W6 tube failed with arcing, replacement ordered; Jilan Yongli 80W A2 tube temporary install 2016-08-03
2016-12-28-500? Reci 130W-145.4W W6 tube (manufactured 2016-08-13) installed
2017-12-101.6 Hour meter installed
2017-12-1711.5
2018-12-17488.9 Secondhand 100W tube installed 2018-12-22
2019-12-161026.3
2020-12-191441.1
2021-03-201515.6 SPT-TR130W tube installed
2021-12-011696.8
2022-02-231765.3
2022-04-061787.1
2022-07-131896.4
  • subcommittee/laser-minutes-20220713.txt
  • Last modified: 2022/07/23 07:50
  • by nick