  • Attendees: BenC, BruceC, BlakeS, NickB, AdamM, GlynnJ, Phil
    • alternating Saturdays with Wednesday evening Wine&Design?
  • LG500 “Little Red”
    • status? cutting 3mm MDF in centre at 25mm/s
  • KH7050 “Kellogg/Middle”\
    • status? cutting 3mm MDF in centre at XXmm/s
  • LC1290 “Big Red”
    • report of a minor fire incident with foam material: watch those cuts!
    • cutting 3mm MDF in centre at xx+mm/s
      • report of 2mm acrylic at 60mm/s!
    • BenC: examine rear right bearing attachment point, change shim? reduce slippage?
      • AdamM: make new shim from 6mm acrylic
    • Empty compressor tanks (needed), water trap (recently done?)
    • Hour meter
      • The hour meter started from 1.6 hours, at 20171210 , 400-512 beam-active cutting hours per annum
DateHour count
2017-12-101.6
2017-12-1711.5
2018-12-17488.9 100W installed 20181222
2019-12-161026.3
2020-12-191441.1
2021-03-201515.6 SPT-TR130W tube installed
2021-05-151554.1
2021-06-191581.1
2021-07-171598.5
2021-08-211617.8
2021-10-201657.2
2021-12-011696.8