subcommittee:laser-minutes-20211020

Laser Subcommittee Meeting 2021-10-20

  • Attendees: BruceC, NickB, BlakeS, FletcherB, AdamM, GlennM
    • alternating Saturdays with Wednesday evening Wine&Design?
  • Nick: New magnetic work light, $4@reddot.com.au , less mysterious discharging than the previous ones?
  • LG500 “Little Red”
    • status? cutting 3mm MDF in centre at 25mm/s
  • KH7050 “Kellogg/Middle”\
    • cutting 3mm MDF in centre at 30mm/s
    • Extractor hose came loose in the tool room
  • LC1290 “Big Red”
    • cutting 3mm MDF in centre at 40+mm/s
    • Remove honeycomb bed, scrape down bed support platform
    • Re-level bed
    • Empty compressor tanks (needed), water trap (recently done?)
    • BruceC: tested air solenoid with relay board
    • BlakeS: investigating air-flow sensors
    • Hour meter
      • The hour meter started from 1.6 hours, at 20171210 , 400-512 beam-active cutting hours per annum
DateHour count
2017-12-101.6
2017-12-1711.5
2018-12-17488.9 100W installed 20181222
2019-12-161026.3
2020-12-191441.1
2021-03-201515.6 SPT-TR130W tube installed
2021-05-151554.1
2021-06-191581.1
2021-07-171598.5
2021-08-211617.8
2021-10-201657.2
  • subcommittee/laser-minutes-20211020.txt