 +====== Laser Subcommittee Meeting 2020-02-15 ======
 +
 +  * Attendees: BlakeS, NickB, FletcherB, Beau
 +  * BlakeS: Trialing Saturday mornings
 +  * Possible rearrangement of machines for combined ducting and chiller stacking
 +  * We'd still like [[subcommittee:​laser-minutes-20191216|red dot beam combiners]],​ which would render getting a tube that has a built in aiming beam moot
 +    * Would we like one?
 +      * Nick, Blake: yes; Fletcher: no
 +        * Fletcher: Recommends crowdfunding it at https://​finance.artifactory.org.au/​
 +          * TODO
 +  * KH7050 Kellogg/​Middle
 +    * Fixed: Beau reported: Z pulley grub screw? was loose, came off, bed was not moving vertically
 +  * LG500 Little Red (out-of-order)
 +    * Replacement tube: arrived, test fired: success
 +    * Requires air extraction
 +  * LC1290 Big Red
 +    * Vacuum internals
 +    * Level bed (was out by 5mm, now within 1mm)
 +    * Test fire setting was "stuck on"
 +      * when triggered from button panel and from PC/LaserCut v5.3
 +      * Set to ~99980ms
 +        * Reset to 300ms MENU -> LASER SET -> LASER TIME
 +        * Panel setting not saved/​restored by PC "​download configuration"?​
 +    * Empty compressor tanks (little content: recently done), water trap
 +    * Hour meter
 +      * The hour meter started from 1.6 hours, at 20171210 , 512 beam-active cutting hours per annum
 +
 +^Date^Hour count^
 +|20171210|1.6|
 +|20171217|11.5|
 +|20180604|181.65|
 +|20181217|488.9 100W installed 20181222 |
 +|20190311|590.1|
 +|20191216|1026.3|
 +|20200113|1055.7|
 +|20200215|1083.6|
  