User Tools

Site Tools


subcommittee:laser-minutes-20181022

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

subcommittee:laser-minutes-20181022 [20181022-2036] (current)
nick created
Line 1: Line 1:
 +====== Laser Subcommittee Meeting 2018-10-22 ======
  
 +Attendees:
 +  * BlakeS, NickB, FletcherB, KamilS
 +
 +Notes:
 +  * Update trainer list, note emeritus ex-member trainers
 +  * New maintenance log sheet
 +  * LC1290 (Big red)
 +    * Hour meter
 +      * The hour meter started from 1.6 hours, at 20171210 ​
 +      * 11.5 hours, at 20171217 ​
 +      * 31.2 hours, at 20171230 ​
 +      * 72.05 hours, at 20180210
 +      * 95.8 hours, 20180305
 +      * 181.65 hours, 20180604
 +      * 234.8 hours, 20180702
 +      * 295.5 hrs, 20180827
 +      * 326 hours, 20180924
 +      * 375.5 hours, 20181022
 +    * Install NPN inductive proximity sensor (with LED indicator!) - 24V 3 pin replaces 2 pin SPST-NO-momentary switch
 +    * Need some extra M4 socket head cap bolts & nuts/​wingnuts to hold tensioners, 3/4 bolts currently have hex nuts
 +      * ACTION: Fletcher: will pick some up
 +  * LG500 (Little red)
 +    * Still staying level
/var/www/wiki.artifactory.org.au/htdocs/data/pages/subcommittee/laser-minutes-20181022.txt · Last modified: 20181022-2036 by nick