User Tools

Site Tools


subcommittee:infrastructure_meeting_2016.07.20

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
subcommittee:infrastructure_meeting_2016.07.20 [20160720-2104]
Stuartm [Meetingpm Times]
subcommittee:infrastructure_meeting_2016.07.20 [20160813-1003] (current)
Stuartm [PROPOSALS to the Artifactory Committee Resulting]
Line 19: Line 19:
   * Spend for new laser head assembly for big red (Lemming to arrange price).   * Spend for new laser head assembly for big red (Lemming to arrange price).
   * Another Camera above the laser $110 + possibly another by near the road.   * Another Camera above the laser $110 + possibly another by near the road.
 +  * Bulid the shed regardless of what is happening with the lease. ​ Build date needs to be set.
  
  
/var/www/wiki.artifactory.org.au/htdocs/data/pages/subcommittee/infrastructure_meeting_2016.07.20.txt · Last modified: 20160813-1003 by Stuartm