User Tools

Site Tools


committee:committee_meeting_2019.04.27

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
committee:committee_meeting_2019.04.27 [20190520-0827]
blakesamuels [Action Summary] Remove comments that were action progress since meeting (shift to 2019-05-25)
committee:committee_meeting_2019.04.27 [20190525-1436] (current)
steve s/roll/role/
Line 273: Line 273:
  
 Member storage coordinator Member storage coordinator
-  * Action to create ​roll - Steve+  * Action to create ​role - Steve
  
 Proposed By-Law - //Proposed Start Date 01/​05/​2019//​ **MATERIAL RACKS** Only members are entitled to store materials on these material racks. Materials are required to be dated with the time of arrival and name.  The materials are welcome to stay on the rack for a maximum of three months (the date can be updated). ​ Materials that over stay that time become free for members to use. Limit per member of 10cm thick of material. Material up to 1200mm in width. Proposed By-Law - //Proposed Start Date 01/​05/​2019//​ **MATERIAL RACKS** Only members are entitled to store materials on these material racks. Materials are required to be dated with the time of arrival and name.  The materials are welcome to stay on the rack for a maximum of three months (the date can be updated). ​ Materials that over stay that time become free for members to use. Limit per member of 10cm thick of material. Material up to 1200mm in width.
/var/www/wiki.artifactory.org.au/htdocs/data/pages/committee/committee_meeting_2019.04.27.txt · Last modified: 20190525-1436 by steve