committee:committee_meeting_2017.03.01

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
committee:committee_meeting_2017.03.01 [2017/03/01 20:41]
steve [Subcommittee reports]
committee:committee_meeting_2017.03.01 [2020/03/12 12:49] (current)
Line 29: Line 29:
 ==== Meeting Times ==== ==== Meeting Times ====
   * Opened:  2000   * Opened:  2000
-  * Closed:  +  * Closed:  2144 
-  * Next meeting: (March 2017 at 20:00) +  * Next meeting: (12 March 2017 at 20:00) 
  
 ==== Acceptance of minutes ==== ==== Acceptance of minutes ====
Line 161: Line 161:
  
   * Laser subcommittee   * Laser subcommittee
-    * meeting sat 12 11am -- all welcome+    * meeting sun 12 11am -- all welcome
          
   * IT SubComm   * IT SubComm
Line 179: Line 179:
     * Electronics Bench - Steve     * Electronics Bench - Steve
     * Tool Room - Lemming     * Tool Room - Lemming
 +      * cordless drills are breeding
     * Welding - Lemming     * Welding - Lemming
 +      * need to bolt down grinder
     * Band Room - Tanner     * Band Room - Tanner
 +      * cables organized
 +      * clean up done
     * Stage - JMM     * Stage - JMM
  
Line 190: Line 194:
  
 $5000 bond to be paid by 1 April $5000 bond to be paid by 1 April
 +
 +4.2 meter racking may still be in the place and can be used, can it be moved/modified?
 +
 +Some offices for lease at small rent ($200/month)
 +
 +Martin to come along to check electrical stuff.
  
  
  • committee/committee_meeting_2017.03.01.1488372063.txt.gz
  • Last modified: 2020/03/12 12:49
  • (external edit)