Perth Artifactory

Trace:

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision Both sides next revision
committee:committee_meeting_2015.09.12 [2015/09/12 13:08]
timbo
committee:committee_meeting_2015.09.12 [2015/09/12 13:09]
timbo
Line 48: Line 48:
     * JeanMichel self nominiates     * JeanMichel self nominiates
       * Huzza, Jean Michel       * Huzza, Jean Michel
-      * +  ​
 ==== Previous Action Items ==== ==== Previous Action Items ====
  
Line 79: Line 79:
   * SM: End of lease coming up... year? Reported cracks to landlord. More flooding, Pipe at top rearranged. Leaks above Galactica, Wall near cad room leaking   * SM: End of lease coming up... year? Reported cracks to landlord. More flooding, Pipe at top rearranged. Leaks above Galactica, Wall near cad room leaking
     * DO: Safety officer should wrangle flammables.     * DO: Safety officer should wrangle flammables.
-    * +
  
  
Line 85: Line 85:
 ==== Chairperson'​s Report ==== ==== Chairperson'​s Report ====
   * Welcome new committee. need to do promo, opendays, t-shirts to raise profile of space.   * Welcome new committee. need to do promo, opendays, t-shirts to raise profile of space.
-  * + 
 ==== Treasurer'​s Report ==== ==== Treasurer'​s Report ====
   * TREASURER   * TREASURER